EEWORLDEEWORLDEEWORLD

Part Number

Search

BC6-Q507-14

Description
Barrier Strip Terminal Block, 20A, 1 Row(s), 1 Deck(s)
CategoryThe connector    terminals   
File Size466KB,13 Pages
ManufacturerThomas & Betts Corporation
Websitehttp://www.tnb.com/
Download Datasheet Parametric View All

BC6-Q507-14 Overview

Barrier Strip Terminal Block, 20A, 1 Row(s), 1 Deck(s)

BC6-Q507-14 Parametric

Parameter NameAttribute value
MakerThomas & Betts Corporation
Reach Compliance Codeunknown
ECCN codeEAR99
Other featuresPOLYPROPYLENE, 94V-0
Fastening methodSCREW
Manufacturer's serial numberBC6
Installation typeBOARD
Number of layers1
Rows1
Number of channels14
Rated current20 A
Rated voltage300 V
safety certificateUL
Terminal and terminal strip typesBARRIER STRIP TERMINAL BLOCK
Wire gauge12 AWG
Base Number Matches1
Barrier Strips
Tri-Barriers
D
ESCRIPTION
/A
PPLICATION
The Tri-Barrier product is an original
Thomas & Betts design and we set
new terminal block standards with its
introduction. In recent years, some of
our competition has copied this
design.
It’s easy to see why we’re copied.
Our Tri-Barrier blocks help contain
stray or frayed wire ends. This
prevents electrical shorts — not only
between positions on the same
block, but also between other
components immediately adjacent to
the block. With today’s high-density
PCB designs, this has become an
increasingly important feature.
TRI-BARRIER STRIPS
A
PPLICATIONS
• Industrial controls and automation
• Machine tools
• HVAC/R
• Power supplies
• Security/Irrigation
• Transformers
D
ESIGN
A
DVANTAGES
• Back barriers to safeguard field
wiring
• Fast wiring – backed-out wire-
ready screws
• Interupted thread prevents screws
from falling out
• Standoffs allow flux and solvents to
drain during cleaning
• Molded-to-length or cut-to-length
versions available
• Slotted or phil-slot screws available
CONNECTOR INDEX
0.250”
0.250”
0.325”
0.325”
0.375”
0.375”
0.375”
0.375”
Pitch, Series #3....................................................56-59
Pitch, Series RSB2..............................................60, 61
Pitch, Series #4....................................................62-65
Pitch, Series RSB3 ..............................................66-69
Pitch, Series #6....................................................70-73
Pitch, Series RSB6 ..............................................74-77
Pitch, Series BC6, Panel Mount ..........................78-79
Pitch, Series MB6, Double Level ........................80, 81
0.4375” Pitch, Series #8 ..................................................82, 83
®
Thomas & Betts Electronics/OEM Division Tel: 901-252-7766 Fax: 901-252-1312
55
Show off your product testing tools at home
I just finished the company's product testing tooling recently. I feel that the tooling we made is quite expensive, costing four or five thousand each. The most troublesome thing is that once the prod...
wateras1 Talking about work
Urgent help: When developing an application to access a USB device, how do I know whether the USB2.0 device only supports full speed?
1. If the host supports USB2.0, when a high-speed USB device is connected, can it be confirmed that the current operating speed is high speed? Can it be switched to full speed manually? 2. Will the ho...
fengyiqishi Embedded System
Help fatal error RC1015: cannot open include file 'winver.h'.
Hello everyone, I am new to wince. Today I installed the platform and ran hello world. When I compiled it, I got an error: fatal error RC1015: cannot open include file 'winver.h'. Please give me some ...
john86 Embedded System
LPC1343 Part 1: ADC Detailed Explanation
I was not idle during the May Day holiday. Except for visiting my parents on May 2, I spent the rest of the time studying LPC1343. After two days of hard work, I finally had a general understanding of...
zhdphao NXP MCU
About PLC
I am a PLC novice. I would like to ask what is the use of the PLC input and output terminals marked as com? How to use them? The more detailed the better, and it would be best if there are easy-to-und...
elise Embedded System
It is said that we go to work on the seventh day of the first lunar month, and on the eighth day...
It is said that we go to work on the seventh day of the Lunar New Year and have a holiday on the eighth day. Do you believe it? ? Then what about those who go home? Don’t they have to come back a day ...
lixiaohai8211 Talking

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

Robot
development
community

Index Files: 1134  2605  1126  286  1108  23  53  6  26  18 
Datasheet   0 1 2 3 4 5 6 7 8 9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
Room 1530, 15th Floor, Building B, No. 18 Zhongguancun Street, Haidian District, Beijing Telephone: (010) 82350740 Postal Code: 100190
Copyright © 2005-2026 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号