EEWORLDEEWORLDEEWORLD

Part Number

Search

OL20K/104P

Description
Switching power supply PWR SPLY:20kW Stack, +O/P
CategoryPower/power management    Switching power supply   
File Size477KB,5 Pages
ManufacturerAdvanced Energy
Environmental Compliance
Download Datasheet Parametric View All

OL20K/104P Overview

Switching power supply PWR SPLY:20kW Stack, +O/P

OL20K/104P Parametric

Parameter NameAttribute value
MakerAdvanced Energy
Product Categoryswitching power supply
seriesOL20K
20kW HIGH VOLTAGE POWER SUPPLY
Series OL20K
FEATURES
20kW of output power
Output voltages from 60kV to over 200kV
Positive or Negative polarity to order
Robust IGBT converter design
Exceptional reliability
High Stability
Excellent inherent ruggedness
Arc Count and Extinguish (ACE) option
Marked
DESCRIPTION
The Series OL20K is a range of high reliability products designed to
meet the rigorous requirements of ion and electron beam systems.
These high performance switch mode systems are based on a power
converter using zero-volt switching. A full bridge of the latest
generation of Insulated Gate Bipolar Transistors (IGBTs) in a fully
regulated closed-loop system capable of continuously supplying up
to 20kW of output power whilst maintaining flexible control down to
a few hundred Watts. These highly reliable rugged systems comprise
two units, a rack mounting power converter through which remote
controls are facilitated, and a separate HV unit employing a modular
disc construction. Numerous features are incorporated to ensure
system integrity is maintained during adverse operating conditions.
Such features include continuous primary current monitoring with
fast pulse truncation and soft recovery, extensive thermal monitoring
and automatic shutdown on key components, passive output current
limiting for instantaneous surge control and independent output
overvoltage sensing. Optionally HiTek Power’s Arc Count and
Extinguish (ACE) system can be installed for active arc management.
Input Voltage:
208VAC ±10% (187VAC to 229VAC) 47-63Hz 3 phase via three M8 studs,
and earth, via M10 stud at 87A rms per phase.
OR
400VAC ±10% (360VAC to 440VAC) 47-63Hz 3 phase via three M6 studs,
and earth, via M8 stud 45A rms per phase.
Polarity:
Positive or negative to order.
Minimum Voltage:
5% of rated output voltage. The unit may be turned down below this but
the specifications are not guaranteed below this level.
Line Regulation:
Less than 0.1% change in output voltage for a 10% change in mains
voltage.
Load Regulation:
Less than 0.1% of rated output voltage for a full load change.
Ripple:
Less than 0.1% peak to peak of rated output voltage.
Transient Response:
The output will recover to within ±1% of set value in less than 100ms
from the removal of a short circuit.
Temperature Coefficient:
200ppm/oC (0.02%/oC).
SPECIFICATION
Output Power:
20kW maximum at full rated output voltage and current.
Output Voltage:
Units available with maximum output voltages from 60kV to 200kV.
Output Current:
Up to 250mA for 60kV and 80mA for 200kV.
w w w. h i t e k p o w e r. c o m
60% off LPC2368 development board
I have an LPC2368 development board, 90% new, from Advanced Electronics. I want to sell it for some cash to buy a 2440 or 6410. The original price is 469, the current price is 240. Contact QQ 28991601...
05210324kw Buy&Sell
[NXP Rapid IoT Review] + 3. A First Look at Rapid IoT Studio
Follow the tutorial step by step, and now try to use Rapid IoT Studio. One bad thing is that it is operated in the form of a web page, which is indeed a bit inconvenient. It would be nice if there is ...
hehung RF/Wirelessly
www.kingofcoder.com 100MB free space + 100MB mysql space
www.kingofcoder.com 100MB free space + 100MB mysql space, come quickly, JSP, PHP, oracle space, it will be opened soon, please register quickly...
fanzw Embedded System
Three op amp problem
[i=s]This post was last edited by lclhitwh on 2016-5-25 21:24[/i] I built a three-op-amp circuit myself, using the op07 op-amp. The input voltage is 1V, but the voltage on R1 is not 1V. What is the re...
lclhitwh Analog electronics
How can Huawei's EC325 automatically connect to the network when it is turned on?
HUAWEI Mobile Connect can be started when the phone is turned on, but the network connection must be connected by clicking once!...
rainchencxy Embedded System

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

Robot
development
community

Index Files: 617  39  768  1540  2781  13  1  16  32  56 
Datasheet   0 1 2 3 4 5 6 7 8 9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
Room 1530, 15th Floor, Building B, No. 18 Zhongguancun Street, Haidian District, Beijing Telephone: (010) 82350740 Postal Code: 100190
Copyright © 2005-2026 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号