The outputs of the UT7R995 can be configured to run at fre-
quencies ranging from 6 MHz to 200 MHz. Each output bank
has the ability to run at separate frequencies and with various
phase skew. Depending upon the output used for feedback to
the PLL, numerous clock division and multiplication options
exist.
The following discussion and list of tables will summarize the
available configuration options for the UT7R995. Tables 1
through 11, are relevant to the following configuration discus-
sions.
Table 1. Feedback Divider Settings (N-factor)
Table 2. Reference Divider Settings (R-Factor)
Table 3. Output Divider Settings - Bank 3 (K-factor)
Table 4. Output Divider Settings - Bank 4 (M-Factor)
Table 5. Frequency Divider Summary
Table 6. Calculating Output Frequency Settings
Table 7. Frequency Range Select
Table 8. Multiplication Factor (MF) Calculation
Table 9. Output Skew Settings
Table 10: Signal Propagation Delays in Various Media
Table 11. PE/HD Settings
Table 12. Power Supply Constraints
1.1 Divider Configuration Settings:
The feedback input divider is controlled by the 3-level DS[1:0]
pins as indicated in Table 1 and the reference input divider is
controlled by the 3-level PD/DIV pin as indicated in Table 2.
Although the Reference divider will continue to operate when
the UT7R995 is in the standard TEST mode of operation, the
Feedback Divider will not be available.
Table 1: Feedback Divider Settings (N-factor)
DS[1:0]
LL
LM
LH
ML
MM
MH
HL
HM
HH
Table 2: Reference Divider Settings (R-factor)
PD/DIV
LOW
1
MID
HIGH
Operating Mode
Powered Down
Normal Operation
Normal Operation
Reference Input
Divider -
(R)
Not Applicable
2
1
Note: 1.
When PD/DIV = LOW, the device enters power-down mode.
In addition to the reference and feedback dividers, the
UT7R995 includes output dividers on Bank 3 and Bank 4,
which are controlled by 3F[1:0] and 4F[1:0] as indicated in Ta-
bles 3 and 4, respectively.
Table 3: Output Divider Settings - Bank 3 (K-factor)
3F(1:0)
LL
HH
Bank 3 Output Divider -
(K)
2
4
Note: 1.
These states are used to program the phase of the respective banks.
Please see Equation 1 along with Tables 8 and 9.
PM
4F[1:0]
LL
Other
1
Table 4: Output Divider Settings - Bank 4 (M-factor)
Bank 4 Output Divider
(M)
2
1
2
3
4
5
1
EV
Feedback Input
Divider -
(N)
Permitted Output
Divider (K or M)
Connected to FB
1 or 2
1
EL
O
Note: 1.These
states are used to program the phase of the respective banks.
Please see Equation 1 along with Tables 8 and 9.
Each of the four divider options and their respective settings are
summarized in Table 5. By applying the divider options in Ta-
ble 5 to the calculations shown in Table 6, the user determines
the proper clock frequency for every output bank.
Table 5: Frequency Divider Summary
Division
Factors
N
R
K
M
D
1, 2, or 4
1 or 2
1, 2, or 4
1 or 2
1 or 2
1
1
IN
6
EN
T
Other
1
1
Available Divider Settings
1, 2, 3, 4, 5, 6, 8, 10, 12
1, 2
1, 2, 4
1, 2
8
10
12
3
Table 6: Calculating Output Frequency Settings
Configuration
Clock Output
Connected to FB
1Qn or 2Qn
3Qn
4Qn
Output Frequency
1Q[1:0]
1
and
2Q[1:0]
1
(N/R) * f
XTAL
(N/R) * K * f
XTAL
(N/R) * M * f
XTAL
(N/R) * (1/K) * f
XTAL
(N/R) * f
XTAL
(N/R) * (M/K) * f
XTAL
(N/R) * (1/M) * f
XTAL
(N/R) * (K/M) * f
XTAL
(N/R) * f
XTAL
3Q[1:0]
4Q[1:0]
Notes:
1. These outputs are undivided copies of the VCO clock. Therefore, the formulas in this column can be used to calculate the nominal VCO operating frequency (f
NOM
)
at a given reference frequency (f
XTAL
) and the divider and feedback configuration. The user must select a configuration and a reference frequency that will generate
a VCO frequency that is within the range specified by FS pin. Please see Table 7.
1.2 Frequency Range and Skew Selection:
The PLL in the UT7R995 operates within three nominal fre-
quency ranges. Each of which is selectable by the user through
the 3-level FS control pin. The selected FS settings given in Ta-
ble 7 determine the nominal operating frequency range of the
divide-by-one outputs of the UT7R995. Reference the first col-
umn of equation in Table 6 to calculate the value of f
NOM
for
any given feedback clock.
Table 7: Frequency Range Select
FS
L
M
H
Selectable output skew is in discrete increments of time unit
(t
U
). The value of t
U
is determined by the FS setting and the
maximum nominal frequency. The equation to be used to deter-
mine the t
U
value is as follows:
T
t
u
Equation 1.
=
1
(f
NOM
* MF)
Nominal PLL Frequency Range
(f
NOM
)
24 to 50 MHz
48 to 100MHz
96 to 200 MHz
IN
D
EV
4
EL
O
PM
The f
NOM
term, selected by the FS signal, is found in Table 7,
and the multiplication factor (MF), also determined by FS, is
shown in Table 8.
After calculating the time unit (t
U
) based on the nominal PLL
frequency (f
NOM
) and multiplication factor (MF), the circuit
designer plans routing requirements of each clock output and its
respective destination receiver. With an understanding of signal
propagation delays through a conductive medium (see Table
10), the designer specifies trace lengths which ensure a signal
propagation delay that is equal to one of the t
U
multiples show
in Table 9. For each output bank, the t
U
skew factors are select-
ed with the tri-level, bank-specific, nF[1:0] pins.
EN
Table 8: MF Calculation
FS
L
M
H
MF
32
16
8
f
NOM
at which t
U
is 1.0ns
31.25 MHz
62.5 MHz
125 MHz
Table 10: Examples of Common Signal Propagation Delays
found in Various Mediums
Medium
Air (Radio Waves)
Coax. Cable (75% Velocity)
Coax. Cable (66% Velocity)
Propagation
Dielectric
Delay (ps/inch) Constant
85
113
129
140 - 180
180
240 - 270
1.0
1.8
2.3
2.8 - 4.5
4.5
8 - 10
Table 9: Output Skew Settings
nF[1:0]
LL
1, 2
FR4 PCB, Outer Trace
Skew
1Q[1:0], 2Q[1:0]
-4t
U
-3t
U
-2t
U
-1t
U
Zero Skew
+1t
U
+2t
U
+3t
U
+4t
U
Skew
3Q[1:0]
Divide by 2
-6t
U
-4t
U
-2t
U
Zero Skew
+2t
U
+4t
U
+6t
U
Divide by 4
Skew
4Q[1:0]
Divide by 2
-6t
U
-4t
U
-2t
U
Zero Skew
FR4 PCB, Inner Trace
Alumina PCB, Inner Trace
LM
LH
ML
MM
MH
HL
HM
HH
2
+4t
U
+6t
U
Inverted
3
IN
D
EV
EL
5
O
Notes:
1. nF[1:0] = LL disables bank specific outputs if TEST=MID and sOE = HIGH.
2. When TEST=MID or HIGH, the Divide-by-2, Divide-by-4, and Inversion
options function as defined in Table 9.
3. When 4Q[1:0] are set to run inverted (4F[1:0] = HH), sOE disables these out-
puts HIGH when PE/HD = HIGH or MID, sOE disables them LOW when
In the field of test and measurement, the development of instrument bus technology has always been the most concerned part for engineers and scientists. From the GPIB bus launched in the 1960s for ins...
Dear Expert:I am a novice and encountered a problem when drawing PCB for the first time:
I need to cut out a small piece of copper in the center of a 3.3V power plane to connect to the 2.5V power supp...
Why do I post this? I have been learning BLE4.0 for a month. I post this to record my learning process. I believe that everyone has learned other series of MCUs. CC2541 integrates 51 core, and it must...
It has been a while since I received the SHT31 Smart Gadget, but due to lack of time, I did not start the review until today.The courier box I received was quite large, but it became very small after ...
I would like to ask how to connect the data cables of 430 and 1602? The downloaded program only has RS, RW, E, interfaces, and no D interface is seen. #include
#include "cry1602.h" typedef unsigned ch...
The client asked me to write a Java program that needs to run under wince6.0. I tested it and it works fine under wince5.0/S3C2450, but not under wince6.0/S3C6410! I looked at the program package and ...
At present, the traffic congestion in cities is quite serious. According to relevant news reports: In China, the traffic congestion has expanded from megacities such as Beijing, Shanghai, and Guang...[Details]
Google's driverless technology is not only an eye-catching technology, but also a subversion of the car usage model.
Those who have watched anti-terrorism films and TV dramas must have been im...[Details]
Analog engineers have traditionally struggled with complexity when designing power supplies that required multiple outputs, dynamic load sharing, hot-swap, or extensive fault-handling capabilities....[Details]
The reason for the light decay of white LEDs: the decline of phosphor performance
So far, the rapid decline of the luminous performance of white light LEDs, especially low-power white light LE...[Details]
We know that microcontroller development tools generally include real-time online emulators and programmers. Among them, online emulators are very good tools, but they are also more expensive...[Details]
Overview
As a remote network communication control method with advanced technology, high reliability, complete functions and reasonable cost, CAN-bus has been widely used in various automa...[Details]
1 Introduction
Building Automation System (BAS) is a distributed monitoring system (DCS) designed according to distributed information and control theory. It is the result of the mutual de...[Details]
1 Introduction
With the development of control, computer, communication, network technology, etc., a new control technology, namely fieldbus, has emerged in the field of industrial control...[Details]
Investment in
the
medical device
industry has been on the rise in recent years. In the past two years, venture capital for medical devices has almost doubled, reaching $4 billion in 2007. Fr...[Details]
Recently, news came from the certification department that the photovoltaic grid-connected inverter of Samil New Energy Co., Ltd. (hereinafter referred to as "Samil New Energy") has once again obta...[Details]
The serial interface real-time clock chip DS1302 launched by Dallas Company in the United States can trickle charge the backup battery of the clock chip. Due to the main features of the chip such a...[Details]
Introduction
Nowadays, people pay more and more attention to the security alarm system, and people have higher and higher requirements for the functions and performance of the alarm. This paper prop...[Details]
1 Load Regulation
Changes in power supply load will cause changes in power supply output. When the load increases, the output decreases, and vice versa, when the load decreases, the output inc...[Details]
At present, with the diversification of portable products and the almost harsh requirements for audio and video parts, the power consumption requirements of the whole machine have been raised to a ...[Details]
1. Tips for charging UPS for the first time
After purchasing a new UPS, plug the UPS into the 220V mains power grid and charge it for at least 12 hours to ensure that the battery is fully char...[Details]