Small Signal Bipolar Transistor, 0.5A I(C), 250V V(BR)CEO, 1-Element, NPN, Silicon, TO-206AA, HERMETIC SEALED, METAL, TO-18, 3 PIN
BSS72G4 Parametric
Parameter Name
Attribute value
Is it Rohs certified?
conform to
Maker
TT Electronics plc
package instruction
HERMETIC SEALED, METAL, TO-18, 3 PIN
Reach Compliance Code
compliant
ECCN code
EAR99
Maximum collector current (IC)
0.5 A
Collector-emitter maximum voltage
250 V
Configuration
SINGLE
Minimum DC current gain (hFE)
40
JEDEC-95 code
TO-206AA
JESD-30 code
O-MBCY-W3
JESD-609 code
e4
Number of components
1
Number of terminals
3
Package body material
METAL
Package shape
ROUND
Package form
CYLINDRICAL
Peak Reflow Temperature (Celsius)
NOT SPECIFIED
Polarity/channel type
NPN
Certification status
Not Qualified
surface mount
NO
Terminal surface
GOLD
Terminal form
WIRE
Terminal location
BOTTOM
Maximum time at peak reflow temperature
NOT SPECIFIED
Transistor component materials
SILICON
Nominal transition frequency (fT)
50 MHz
BSS72G4 Preview
BSS72
Dimensions in mm (inches).
5.84 (0.230)
5.31 (0.209)
4.95 (0.195)
4.52 (0.178)
Bipolar NPN Device in a
Hermetically sealed TO18
Metal Package.
Bipolar NPN Device.
V
CEO
= 250V
0.48 (0.019)
0.41 (0.016)
dia.
I
C
= 0.5A
All Semelab hermetically sealed products
can be processed in accordance with the
requirements of BS, CECC and JAN,
JANTX, JANTXV and JANS specifications
3
2
1
2.54 (0.100)
Nom.
TO18 (TO206AA)
PINOUTS
1 – Emitter
2 – Base
3 – Collector
Parameter
V
CEO
*
I
C(CONT)
h
FE
f
t
P
D
Test Conditions
Min.
Typ.
Max.
250
0.5
Units
V
A
-
Hz
@ 10/30m (V
CE
/ I
C
)
40
50M
250
0.5
W
* Maximum Working Voltage
This is a shortform datasheet. For a full datasheet please contact
sales@semelab.co.uk.
Semelab Plc reserves the right to change test conditions, parameter limits and package dimensions without notice. Information furnished by Semelab is believed
to be both accurate and reliable at the time of going to press. However Semelab assumes no responsibility for any errors or omissions discovered in its use.
With the construction of 5G networks, the high cost of 5G base stations, especially the high energy consumption, has become widely known. 5G mobile phones that communicate with base stations have too ...
[size=4]I saw an activity of SF Express two days ago. Download the official SF Express software and register to get two chances to send SF Express express for 1 cent. I have tested it myself and it wo...
In order to prevent the battery from being overcharged, the charging endpoint needs to be controlled. When the battery is fully charged, there will be some special information available to determine w...
The phone's built-in memory card always had problems, and I had 50 gold coins. So I changed it. 8g of memory card cost 46 gold coins. I didn't take a photo, so I just used the official photo....
I recently wanted to make an STM32 development board for my graduation project, but the package I drew on the PCB always turns green. I checked the reason and found that it turns green because the pin...