EEWORLDEEWORLDEEWORLD

Part Number

Search

HSB-15-1.5

Description
pwr sup 15v 22.5W 1.5A sng out
Categorysemiconductor    Power management   
File Size25KB,6 Pages
ManufacturerTDK Corporation
Websitehttp://www.tdk.com
Environmental Compliance  
Download Datasheet Parametric View All

HSB-15-1.5 Overview

pwr sup 15v 22.5W 1.5A sng out

HSB-15-1.5 Parametric

Parameter NameAttribute value
Datasheets
H Series Instr Manual
H Series
Standard Package1
CategoryPower Supplies - External/Internal (Off-Board)
FamilyAC DC Converters
TypeLine
Number of Outputs1
Voltage - Inpu100, 120, 220, 230, 240 VAC
Voltage - Output 115V
Voltage - Output 2-
Voltage - Output 3-
Voltage - Output 4-
Current - Output (Max)1.5A
Power (Watts)22W
ApplicationsITE (Commercial)
Voltage - Isolati3.75kV (3750V)
Efficiency55%
Operating Temperature0°C ~ 70°C
FeaturesAdjustable Output, Remote Sense, Standby Outpu
Mounting TypeChassis Mou
Size / Dimensi6.50" L x 4.02" W x 1.65" H (165.0mm x 102.0mm x 42.0mm)
Minimum Load Required-
ApprovalsCE
Power (Watts) - Max22W
Other NamesHSB151.5
Installation Instructions – H Series
** Important Note
Before connecting AC power to the H Series, please verify that the power transformer is
correctly terminated as detailed section 6. Failure to do so could damage the power
supply.
Installation
1) Power Supply Terminals
To meet safety requirements, the power supply terminals must not be used as the
external terminations of any equipment. The wiring of any primary circuitry should
be routed in such a way that it does not touch any secondary (output) components.
2) Service Personnel
This product must only be installed in a restricted access location, accessible to
authorized competent personnel only. Some surfaces of the power supply may be
hot, and must not be touched when the product is in operation.
3) Earthing
For protective earthing, please ensure a secure connection of the Frame Ground
terminal to the ground terminal of the equipment as the protective earth connection.
Screws and washers used must be of a suitable material as defined by the relevant
agency specifications.
4) Cooling
The power supply must be installed where the unit is allowed free air convection.
Forced air-cooling will enhance reliability.
5) Remote sensing
Some models have remote sensing to compensate for load cable drops. The H
Series units come wired for local sense from the factory. Remove the wire jumpers
and install remote sense wiring if load regulation is critical.
Remote sense wiring to the end load should ideally be twisted together and routed
separately from load cables or other noisy wiring.
6) Input connection
The AC power is wired directly to the primary of the main power transformer. One or
two jumpers will also needed on that transformer. Connect the AC Line & Neutral
and jumper(s) as follows:
LAMBDA
HSeries

Technical ResourceMore

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

Robot
development
community

Index Files: 177  2495  267  1097  2750  4  51  6  23  56 
Datasheet   0 1 2 3 4 5 6 7 8 9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
Room 1530, 15th Floor, Building B, No. 18 Zhongguancun Street, Haidian District, Beijing Telephone: (010) 82350740 Postal Code: 100190
Copyright © 2005-2026 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号