EEWORLDEEWORLDEEWORLD

Part Number

Search

177-740-2-69CS8J1-18RWN

Description
Cable Assembly, 28AWG,
CategoryThe connector    Connector bracket   
File Size858KB,5 Pages
ManufacturerGlenair
Websitehttp://www.glenair.com/
Environmental Compliance
Download Datasheet Parametric View All

177-740-2-69CS8J1-18RWN Overview

Cable Assembly, 28AWG,

177-740-2-69CS8J1-18RWN Parametric

Parameter NameAttribute value
Is it Rohs certified?conform to
Objectid7005065656
Reach Compliance Codecompliant
Country Of OriginUSA
YTEOL8.75
Other featuresSTANDARD: MIL-DTL-83513, EMI SHIELDED
CertificationMIL
Conductor surface treatmentSILVER
conductor materialCOPPER
ConnectorSide1MICRO-D MALE
ConnectorSide2MICRO-D FEMALE
Connector bracket typeCABLE ASSEMBLY
structureSTRANDED
Cross-sectional area0.081 mm2
DIN complianceNO
IEC complianceNO
insulator materialCROSSLINKED ETHYLENE-TETRAFLUOROETHYLENE
length0.467 mm
MIL complianceYES
Number of conductors69
Maximum operating temperature150 °C
Minimum operating temperature-55 °C
Rated current3 A
Rated voltage150 V
resistance0.244 Ω
shieldYES
stay7X36
Wire gauge28 AWG
Wire and Cable NamesFLEXIBLE CORD AND FIXTURE WIRE
B
SHIELDING EFFECTIVENESS (Db)
1.00E+04
1.00E+05
1.00E+06
1.00E+07
1.00E+08
1.00E+09
SHIELDING EFFECTIVENESS (Db)
Micro-D Harness
EMI Performance with Ground Spring
100
90
80
70
60
50
40
30
20
10
0
1.00E+03
MWDM Micro-D
Shielded Cable Assembly
Single-Ended or Double-Ended–These
easy-to-order cable
assemblies eliminate the need for expensive assembly labor. 100%
tested and ready for use.
Now With Twisted Pairs–No
need to create a procurement
specification for Micro-D cables with twisted pairs. Glenair 177-740
cables are furnished with a full complement of white/blue twisted
pair wires.
Integral Shield Termination–The
connector shell has a platform
to accept Band-It shield termination bands. The cable shield braid is
attached directly to the connector.
Save Labor, Reduce Weight and Improve EMI Shielding
with Glenair’s Micro-D Shielded Cable Assemblies
Aerospace electronics systems require higher and higher levels of protection from radiated emissions. Glenair’s
fully shielded Micro-D cable assemblies meet this need. The cable shield is attached directly onto the one-
piece connector shell and secured with a stainless steel
Band-Master™ ATS
clamp. These pre-wired, 100% tested
assemblies meet the requirements of MIL-DTL-83513. An optional ground spring on the pin connector assures low
shell-to-shell resistance. Available with a variety of wire types and shields, Micro-D shielded assemblies can be
ordered in any length, either single-ended or “back-to-back”.
Ground Spring and EMI Shielding Effectiveness
A gold-plated stainless steel ground spring on the pin connector mating
face offers substantial improvement in EMI protection. The graphs
compare identical connectors tested with and without ground springs.
EMI Performance without Ground Spring
100
90
80
70
60
50
40
30
20
10
0
1.00E+03
1.00E+04
1.00E+05
1.00E+06
1.00E+07
1.00E+08
1.00E+09
frequency (Hz)
frequency (Hz)
© 2013 Glenair, Inc.
High Performance Micro-D Connectors and Cables
U.S. CAGE Code 06324
Printed in U.S.A.
GLENAIR, INC.
1211 AIR WAY
GLENDALE, CA 91201-2497
818-247-6000
FAX 818-500-9912
www.glenair.com
B-14
E-Mail: sales@glenair.com
New book questions
Did the author add some knowledge about real-time systems? Or is it all bare?...
sbk100 Microcontroller MCU
2012 Competition Award-winning Papers, Source Code, PCB (Part 4)
This post collects some winning works of the 2012 competition, all of which can be downloaded directly without points. [/size] [size=4] [/size] [size=4][list] [*][url=https://download.eeworld.com.cn/s...
sigma Robotics Development
EEWORLD University - Teach you how to learn DSP video tutorials step by step
Teach you how to learn DSP video tutorial : https://training.eeworld.com.cn/course/3804...
tiankai001 DSP and ARM Processors
Silicon Valley is bad, China is good
高科技业员工在过去10年所走的路并不平坦,他们在过去9年中的薪酬亦减少了12%,反映出矽谷工作薪酬的反复无常以及网路业泡沬爆破后,矽谷高科业的再次挣扎。  根据联邦劳工局的统计资料,2000年矽谷11个高科技行业的员工平均年薪为120,000元,当时投资者投入的资金争先恐后地来到矽谷,而高科员工更因人才缺乏而成为企业界争取的对象。  疯狂时期已不再  到了2002年,矽谷高科员工情况转逆,员工的年...
凯哥 Talking about work
How to display the startup logo?
I am using the ARM of i.mx35. How can I display the boot logo? What code do I need to add to the BSP?...
yuri_su Embedded System
The second landlord is such a rip-off
The sub-landlords in Shanghai are so corrupt that they charge 1500 last year and 2000 this year. Many people have moved to more distant places for a bedroom of more than 10 square meters. These sub-la...
平行电 Talking

Technical ResourceMore

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

Robot
development
community

Index Files: 1119  2019  1881  2552  1652  23  41  38  52  34 
Datasheet   0 1 2 3 4 5 6 7 8 9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
Room 1530, 15th Floor, Building B, No. 18 Zhongguancun Street, Haidian District, Beijing Telephone: (010) 82350740 Postal Code: 100190
Copyright © 2005-2026 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号