logo Training

Mentor Expedition VX2.3 four-layer Bluetooth product PCB design tutorial

Total of 23 lessons ,6 hours and 54 minutes and 10 seconds
Profile

    This set of tutorials uses the new version of Mentor Expedition VX2.3 to explain in stages. From the creation of schematic libraries, schematics, PCB libraries to the layout and routing of PCB design, the whole process is explained and communicated with everyone. How to draw each device? How is it placed? How to pull each wire? What are the power cords? What are signal lines? These will be explained in detail one by one, and novices can generally do it themselves after reading it once. The entire process from scratch is explained clearly, so that as a novice, you can really learn something.

[Course Issue 1]: Course introduction and creation of central library

[Course Content]: This live broadcast mainly introduces the general process and steps of electronic design, and gives an overall introduction to the actual project and sort out the design ideas. At the same time, it is introduced to the component library creation stage of this practical project to learn various types of component creation methods and creation techniques.

1) Course introduction

2) Schematic package library production

3) PCB package library production

4) Schematic drawing and inspection (1)

5) QA technical Q&

 

A [course second period]: PCB design preprocessing part

[course content]: Part 1 This live broadcast explains how to use Mentor software to create components. After the library components are created, how to use these components to draw the required schematic diagram? How to operate it specifically and what needs to be paid attention to?

Let’s learn together during this live broadcast.

1) Schematic drawing and inspection (2)

2) Schematic guide netlist to PCB

3) PCB design default settings and color scheme

4) Structure import and processing

5) QA technical Q&A



[Course Phase 3]: Modular layout Design

[Course Content]: In PCB design, layout is a very important step. The quality of the layout is related to the subsequent wiring work. It is important to lay out your ideas before taking action. First, clarify your ideas, determine which devices belong to which functional modules, layout them according to the functional modules, and then deal with the details. Only in this way can the layout design be completed in an orderly manner, so let's learn this together.

1) Grasp devices according to modules

2) Place structural devices according to structural requirements

3) Whole board layout planning

4) Device layout according to modularization

5) QA technical questions and answers



[Course Issue 4]: Whole board layout optimization and wiring design preliminaries Processing 

[Course Content]: After the modular layout is completed, the whole board device layout design can be started. Before starting the wiring work after layout, some pre-processing work should be started to prepare the wiring design. Set the rule attributes of stackup and PCB design to ensure signal routing requirements. Wiring is a time-consuming part of PCB design. How to plan the wiring space, clarify the wiring ideas, and what wires to connect first and what wires to connect later are all things that need to be mastered. Let’s learn about these contents in this live broadcast.

1) Whole board layout optimization

2) Overlay processing and design rule addition

3) Whole board wiring planning

4) Wiring according to modules

5) QA technical Q



&A [Course Issue 5]: Whole board circuit connectivity and wiring optimization

[Course content] : After the modular wiring is completed, the whole board line connectivity processing can be started. During the processing, the lines are connected according to the wiring planning. After being connected, in order to ensure that the designed product is more beautiful and has less signal interference, the wiring content needs to be repaired and the line optimized.

1) Whole-board wiring connectivity processing

2) Power supply processing

3) Whole-board wiring optimization processing

4) DRC detection and elimination

5) QA technical Q&A



[Course Issue 6]: PCB design post-processing 

[Course content]: For a PCB design, After the layout and routing is completed, 90% of the entire project is considered completed. What work remains for the remaining 10%? After the design is completed, it is usually sent to the board factory for production. Considering the issue of confidentiality, it is not recommended to directly send the PCB source file to the board factory for production. How to output the relevant production files is a knowledge point we need to master.

1) Silk screen adjustment

2) Adding light painting Gerber files

3) Light painting Gerber file output and inspection

4) File archiving and saving

5) QA technical questions and answers

Chapters
Unfold

You Might Like

Recommended Posts

lm3s101 gpio port interconnection problem
The situation is like this, I use pa0 to send a square wave signal with a period of 100us, and use pa1 to receive it, with a 39k resistor connected in the middle. Why is the low level of the signal de
sciencekn1 Microcontroller MCU
Showing the process of WEBENCH design + high brightness LED design 1
In this design software, after selecting LED ARCHITECT, you can enter the lumen brightness design interface. According to my design requirements, I set the initial input voltage to 12V between 10-14V
accboy Analogue and Mixed Signal
Newbie help... MSP430 MCU controls LCD display
How to control LCD with MCU? I am using MSP430f149 MCU, and now I need to code on this board to control the LCD to display something. Can you give me some ideas on how to do it? I don't know where to
fzuyoup Embedded System
How to measure the lower frequency in multisim
As the title says, the digital electronics experiment requires making a simple digital clock. After 555 oscillation, the frequency of 1khz is obtained. After 74ls90 division, three 90 strings divide i
纠结者 Analog electronics
After setting the "owner" information in the wince control panel, the information disappears after restarting the phone
Where are these defaults stored? Where should I change them?
qy7551693 Embedded System
100 Ask for help from all the experts: About the serial port sending and receiving program!
[b]The original serial port communication program under EVC is as follows: [/b] /************************************** Function name: OpenPort Description: Open the serial port Input parameters: LPCT
dyw07 Embedded System
Recommended Content
Web users are watching Change

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京B2-20211791 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号