After the pcb generates the network list, many flying wires will appear. When the original is moved, the port through which the flying wire passes will constantly change (sometimes passing through pad
[color=#333333]Interference signal problem in receiver test When testing LTE, the interference signal is required to be [/color][color=#000][font=arial]E-UTRA signal, so should FDD/TDD be used as the
I downloaded the demo yesterday. Then I copied the LCD demo of CH3_1 to my own project and included other .C .H. : After compiling, the following errors occurred: "../main.c", line 156: warning #225-D
The requirements of paper machines for frequency conversion control and the basic control methods of multi-drive systems are introduced, with emphasis on the communication of the human-machine interfa
The micropython firmware of the Nucleo-F091RC development board can be written through STLink and then reset. It needs to be connected through terminal software. [list] [*] [/list] [b][color=#5E7384]T