Latch up Current...................................................... >200 mA
Operating Range
Range
Commercial
Industrial
Automotive-A
Ambient
Temperature
0°C to +70°C
–40°C to +85°C
–40°C to +85°C
V
CC
3.3V
±
10%
3.3V
±
10%
3.3V
±
10%
Electrical Characteristics
Over the Operating Range
Parameter
V
OH
V
OL
V
IH
V
IL
I
IX
I
OZ
I
CC
Description
Test Conditions
–10 (Industrial/
Auto-A)
Min
Output HIGH Voltage V
CC
= Min.,
I
OH
= –4.0 mA
Output LOW Voltage
Input HIGH Voltage
Input LOW Voltage
[2]
Input Leakage Current GND < V
I
< V
CC
Output Leakage
Current
V
CC
Operating
Supply Current
Automatic CE
Power down Current
—TTL Inputs
Automatic CE
Power down Current
—CMOS Inputs
GND < V
I
< V
CC
,
Output Disabled
V
CC
= Max.,
I
OUT
= 0 mA,
f = f
MAX
= 1/t
RC
Max. V
CC
, CE > V
IH
V
IN
> V
IH
or
V
IN
< V
IL
, f = f
MAX
Max. V
CC
,
CE > V
CC
– 0.3V,
V
IN
> V
CC
– 0.3V,
or V
IN
< 0.3V, f = 0
V
CC
= Min.,
I
OL
= 8.0 mA
2.0
–0.3
–1
–1
2.4
0.4
V
CC
+ 0.3
0.8
+1
+1
80
2.0
–0.3
–1
–1
Max
–12 (Industrial)
Min
2.4
0.4
V
CC
+ 0.3
0.8
+1
+1
75
2.0
–0.3
–1
–1
Max
–15 (Industrial)
Min
2.4
0.4
V
CC
+ 0.3
0.8
+1
+1
70
Max.
V
V
V
V
μA
μA
mA
Unit
I
SB1
15
15
15
mA
I
SB2
5
5
5
mA
Capacitance
[3]
Parameter
C
IN
C
OUT
Description
Input Capacitance
Output Capacitance
Test Conditions
T
A
= 25°C, f = 1 MHz,
V
CC
= 5.0V
Max.
8
8
Unit
pF
pF
Notes
2. V
IL
(min.) = –2.0V for pulse durations of less than 20 ns.
3. Tested initially and after any design or process changes that may affect these parameters.
Document #: 38-05130 Rev. *G
Page 3 of 10
[+] Feedback
CY7C1019CV33
Figure 3. AC Test Loads and Waveforms
[4]
3.3V
OUTPUT
30 pF
R2 GND
351Ω
R 317Ω
3.0V
ALL INPUT PULSES
90%
10%
90%
10%
High-Z characteristics:
3.3V
OUTPUT
5 pF
R2
351Ω
R 317Ω
(a)
Rise Time: 1 V/ns
(b)
Fall Time: 1 V/ns
(c)
Switching Characteristics
Over the Operating Range
[5]
Parameter
Read Cycle
t
RC
t
AA
t
OHA
t
ACE
t
DOE
t
LZOE
t
HZOE
t
LZCE
t
HZCE
t
PU
t
PD
[8]
[8]
Description
-10 (Industrial/
Auto-A)
Min
Max
-12 (Industrial)
Min
12
Max
-15 (Industrial)
Min
15
Max
Unit
Read Cycle Time
Address to Data Valid
Data Hold from Address Change
CE LOW to Data Valid
OE LOW to Data Valid
OE LOW to Low Z
OE HIGH to High Z
[6, 7]
CE LOW to Low Z
[7]
CE HIGH to High
Z
[6, 7]
CE LOW to Power Up
CE HIGH to Power Down
Write Cycle Time
CE LOW to Write End
Address Setup to Write End
Address Hold from Write End
Address Setup to Write Start
WE Pulse Width
Data Setup to Write End
Data Hold from Write End
WE HIGH to Low Z
[7]
WE LOW to High Z
[6, 7]
10
10
3
10
5
0
5
3
5
0
10
10
8
8
0
0
7
5
0
3
5
ns
15
ns
ns
15
7
ns
ns
ns
7
ns
ns
7
ns
ns
15
ns
ns
ns
ns
ns
ns
ns
ns
ns
ns
7
ns
12
3
12
6
0
6
3
6
0
12
12
9
9
0
0
8
6
0
3
6
15
10
10
0
0
10
8
0
3
0
3
0
3
Write Cycle
[9, 10]
t
WC
t
SCE
t
AW
t
HA
t
SA
t
PWE
t
SD
t
HD
t
LZWE
t
HZWE
Notes
4. AC characteristics (except High-Z) for all speeds are tested using the Thevenin load shown in section (a) in
Figure 3.
High-Z characteristics are tested for all
speeds using the test load shown in section (c) in
Figure 3.
5. Test conditions assume signal transition time of 3 ns or less, timing reference levels of 1.5V, input pulse levels of 0 to 3.0V.
6. t
HZOE
, t
HZCE
, and t
HZWE
are specified with a load capacitance of 5 pF as in part (d) of
Figure 3.
Transition is measured
±500
mV from steady-state voltage.
7. At any given temperature and voltage condition, t
HZCE
is less than t
LZCE
, t
HZOE
is less than t
LZOE
, and t
HZWE
is less than t
LZWE
for any given device.
8. This parameter is guaranteed by design and is not tested.
9. The internal write time of the memory is defined by the overlap of CE LOW and WE LOW. CE and WE must be LOW to initiate a write, and the transition of
any of these signals can terminate the write. The input data setup and hold timing should be referenced to the leading edge of the signal that terminates the write.
10. The minimum write cycle time for Write Cycle no. 3 (WE controlled, OE LOW) is the sum of t
[font=微软雅黑][size=3]Shenzhen Jiuzhou Electric Co., Ltd., a large state-owned holding company, is recruiting talents[/size][/font] [font=微软雅黑][size=3] [/size][/font] [font=微软雅黑][size=3]Recruitment posit...
{:1_133:} RT This problem has existed for a long time, but I am too lazy to fix the system: win10 64-bit. I bought a USB blaster downloader online, FT245RL and CPLD solution. There is also a FT232R US...
Today, the LSM303AGR sensor on the SensorTile has been successfully transplanted, so the three most basic sensors have been transplanted. They are: [list] [*]LPS22HB: air pressure + temperature sensor...
When designing, you should try to ensure that there is a global reset signal, or ensure that the trigger and counter have been correctly cleared before use and the state machine is in a known state. T...
Dear experts, I need to shape a narrow pulse of 1ns width into a rectangular wave to facilitate pulse counting later. The general trigger cannot meet this performance. Please give me some advice~~~~...
If the ultimate form of a car is a silicon-based life form, then in
the field of
intelligent driving
, it has gradually taken on the appearance of a "veteran driver." In
the field of
the ...[Details]
With the rapid development of technology, automotive intelligence is increasing at an unprecedented rate. This not only enhances vehicle functionality and comfort, but also places higher deman...[Details]
The structure of an LCD TV primarily consists of the LCD display module, power module, driver module (primarily including the main driver board and tuner board), and keypad module. LCD display modu...[Details]
White light LEDs are voltage-sensitive devices. In actual operation, their upper limit is 20mA. However, the current often increases due to various reasons during use. If no protective measures are...[Details]
The Automotive Testing and Quality Assurance Expo (ATE 2025) will open on August 27th. At the expo, Rohde & Schwarz (R&S) will showcase six automotive testing solutions, themed "Intelligently Drivi...[Details]
introduction
As “energy conservation and emission reduction” has become an indicator of the National Economic Development Outline of the 11th Five-Year Plan, people’s awareness of green enviro...[Details]
Smartphones have become essential digital devices, and the growing number of smartphone-centric applications is enriching people's lives. As users, they desire a better app experience and a wider r...[Details]
In the scorching summer, electric fans are a must-have for cooling down people's homes. However, I believe most people have encountered this situation: the fan is plugged in, the switch is pressed,...[Details]
Electric vehicles' 12V batteries don't rely on a generator to power them. Only gasoline-powered vehicles rely on the engine to drive a generator to generate electricity while driving, which is used...[Details]
1. Fault phenomenon and cause analysis
1. During the operation of the equipment, the expansion sleeve is subjected to a large torque, and the mating surfaces of the shaft and the sleeve move...[Details]
In the field of communications power supplies, AC/DC rectifier power supplies are called primary power supplies or basic power supplies, while DC/DC converters are called secondary power supplies. ...[Details]
Lightweighting of automobiles is still a relatively unfamiliar term for automobiles. With the continuous improvement of environmental protection requirements, relevant regulations have also put for...[Details]
01. Introduction
As in-vehicle networks migrate from the CAN
bus
to
Ethernet
, traditional millisecond-level synchronization accuracy can no longer meet the requirements of mul...[Details]
Traditionally, electrical energy is transmitted primarily through wires, requiring direct physical contact between the power source and the load. With the increasing number of electrical devices in...[Details]
Silicon Labs (also known as "Silicon Labs"), an innovative leader in low-power wireless connectivity, will showcase its cutting-edge artificial intelligence (AI) and Internet of Things (IoT) solu...[Details]