Note: A 0.01 Ohm addition to be added to the performance of all resistors <10 Ohms.
Pulse Performance Data
Lightning Surge
Lightning surge resistors are tested in accordance with IEC 60 115-1 using both 1.2/50µs and 10/700µs pulse shapes. 10 pulses are applied. The limit of
acceptance is a shift in resistance of less than 1% from the initial value.
2512
2010
1206
0805
0603
2512
2010
1206
0805
0603
General Note
TT Electronics reserves the right to make changes in product specification without notice or liability.
All information is subject to TT Electronics’ own data and is considered accurate at time of going to print.
The single impulse graph is the result of 50 impulses of rectangular shape applied at one minute intervals. The limit of acceptance was a shift in
resistance of less than 1% from the initial value.
2512
2010
1206
0805
0603
Continuous Load Due to Repetitive Pulses
The continuous load graph was obtained by applying repetitive rectangular pulses where the pulse period was adjusted so that the average
power dissipated in the resistor was equal to its rated power at 70°C. Again the limit of acceptance was a shift in resistance of less than 1% from the
initial value
2512
2010
1206
0805
0603
General Note
TT Electronics reserves the right to make changes in product specification without notice or liability.
All information is subject to TT Electronics’ own data and is considered accurate at time of going to print.
When I use IAR6.4 to open the ADuCM360 example downloaded from the ADI official website, it prompts that the XXX.h file cannot be found. This is a problem with the project's directory specification. A...
The circuit of the switching power supply is relatively complex. The input end of the switching regulator is generally connected to an input filter with a small inductance and a large capacitance. At ...
PCB browsing: http://dianzi123.vip.mingyao.net/photos/index.htm China Electronic Engineer Professional Navigation Website http://dianzi123.vip.mingyao.net/ If you need PCB part-time job, please contac...
A newly established company, the company's current business is to build a website. It has never done any embedded things before, and there are no embedded employees. Now... the boss wants to develop i...