Original project address: https://euclidprobe.github.io/Github address: https://github.com/nionio6915/Euclid_Probe
Klicky Github address: https://github.com/jlas1/Klicky-Probe
has been verified.
After proofing, please follow the instructions in the schematic diagram to weld the corresponding jumpers and install the magnets (do not preview the schematic diagram of the project, the version is lagging behind, please open it with an editor!).
Do not tighten the screws too hard when installing the magnet, as this may cause the magnet to break!
Recommended purchase: 6X3 hole 3mm round countersunk magnet (note the use of opposite suction); M2*5 countersunk head screws (choose hexagon socket head screws are not easy to slide)

. The two PCBs are exactly the same, and weld accordingly according to the instructions in the schematic diagram.
In the near future, it is planned to upgrade the Big Fish CC to 3Z automatic leveling, and the project will be verified at that time.
Verification passed on 2023/4/17:


See the attachment for the actual machine demonstration video.
3Z transformation progress:
2023/3/18 The overall 3Z structure has been completed, with a few non-important parts missing. The klipper host computer is compiling. Unfortunately, orangepi zero2 was short-circuited yesterday and is waiting for the host computer to be repaired.
2023/4/17 The overall functionality has been completed and is waiting for sealing. Complete the installation of Euclid Probe and Klicky driver, complete virtual z limit, complete automatic 3Z leveling, and complete platform mesh calculation.
Update log:
2023/02/22 Ver1.1 version: The schematic diagram has been significantly modified. Modify to use 2 PCBs with exactly the same structure and selectively solder them based on function.
2023/03/18 Ver1.2 version: Modify the fatal wiring error in the previous version, adjust the size of the mounting holes to avoid protruding screws.
2023/04/17 Ver1.3 version: Adjusted the screw hole size and passed the verification.
2023/06/09 Ver1.4 version: Please comment on the interference problem of the official print and update it, change the packaging direction; change the jumper packaging to 0201, which is easier to solder. Awaiting proofing verification.