EEWORLDEEWORLDEEWORLD

Part Number

Search

PSL-KT-MROAP

Description
Tool Kits & Cases MAINTENANCE LOCKOUT MRO RED
CategoryTools and equipment   
File Size2MB,11 Pages
ManufacturerPanduit
Websitehttp://www.panduit.com
Environmental Compliance
Download Datasheet Parametric Compare View All

PSL-KT-MROAP Online Shopping

Suppliers Part Number Price MOQ In stock  
PSL-KT-MROAP - - View Buy Now

PSL-KT-MROAP Overview

Tool Kits & Cases MAINTENANCE LOCKOUT MRO RED

PSL-KT-MROAP Parametric

Parameter NameAttribute value
Product AttributeAttribute Value
ManufacturerPanduit
Product CategoryTool Kits & Cases
RoHSDetails
ProductTool Kits
TypeLockout Kit
Description/FunctionContains safety and lockout equipment
Factory Pack Quantity1
800.777.3300
|
Panduit.com
Intro |
Lockout / Tagout
1
Just shutting down or disconnecting
equipment is not enough…Lockout/
Tagout keeps employees safe by making
it inoperable. Comply with OSHA
Regulations and LOCK IT OUT!
Before repairs, servicing, maintenance, or set-up of machines and
equipment can begin, prevent the unexpected — the accidental
start-up!
Procedures, devices, and personnel must be set in place to prevent the serious
injury or death that could occur when someone thinks something is safely off.
To ensure machines and equipment remain inoperable means establishing a
“program consisting of energy control procedures, employee training, and periodic
inspections...” as described in the OSHA standard. The standard also identifies
products used for achieving these goals, such as lockout and tagout devices.
Highlighted here are seven
steps to creating an effective
lockout/tagout program.
þ
1. Be Aware of the Lockout Regulations
Become familiar with the federal regulations known as The Control of
Hazardous Energy (Lockout/Tagout).
þ
5. Set up Lockout Training & Procedure Program
Develop, standardize, and document the lockout process for each energy source.
Identify employees’ level of involvement in the program – those that are made
aware, affected, and to perform the lockout procedures. Accomplish this through
comprehensive training programs and certifications.
þ
2. Develop List of Machinery & Equipment
Survey your facility for all machinery and equipment that have the potential
for requiring lockout.
þ
6. Implement the Lockout Program
Initiate and enact the lockout/tagout program in accordance with the training
procedures. Post reminders and have the necessary lockout/tagout devices
readily available.
þ
3. Identify & Mark Energy Sources & Lockout
Points
Locate and document start-up areas of energy sources, such as:
• Mechanical • Electrical • Hydraulic
• Thermal
• Pressure • Process Control
• Stored Energy (gravity, springs)
þ
7. Review Lockout Program
Identify and document changes to existing procedures and new energy sources
that require lockout. Make corrections, changes, and additions to the program.
Conduct periodic review of lockout procedures (required at least annually) to
ensure they are up to date and requirements are being met.
þ
4. Determine the Lockout Controls
Identify and document the necessary devices that isolate and lock out
energy sources, and secure them for on-site use. Standardize the devices
for various functions for proper identification.
Post signs, apply labels and tags…
…to warn and identify energy source
areas and points requiring shut-down and lockout/tagout procedures.
29 CFR § 1910.147… The Control of Hazardous Energy (Lockout/Tagout) ...requires the employers to establish a program and utilize procedures for affixing
appropriate lockout devices or tagout devices to energy isolating devices, and to otherwise disable machines or equipment to prevent unexpected energization,
start-up or release of stored energy in order to prevent injury to employees.
We offer solutions to help meet your lockout/tagout requirements and make your employees aware of the energy source hazards found throughout your facility. Look for
products to meet your specific lockout needs on the following pages - ranging from lockout devices to training materials. Call us for consultation and on-site assessment
of your lockout/tagout requirements.

PSL-KT-MROAP Related Products

PSL-KT-MROAP PSL-KT-CONAP PSL-KT-MROA-F PSL-KT-CONAPX
Description Tool Kits & Cases MAINTENANCE LOCKOUT MRO RED Tool Kits & Cases CONTRACTORS LOCKOUT KIT, RED Tool Kits & Cases MAINTENANCE LOCKOUT KIT, FRENCH, RED Tool Kits & Cases CONTRACTORS LOCKOUT KIT, RED W/O PADLOCK
Product Attribute Attribute Value Attribute Value Attribute Value Attribute Value
Manufacturer Panduit Panduit Panduit Panduit
Product Category Tool Kits & Cases Tool Kits & Cases Tool Kits & Cases Tool Kits & Cases
RoHS Details Details Details Details
Product Tool Kits Tool Kits Tool Kits Tool Kits
Type Lockout Kit Lockout Kit Lockout Kit Lockout Kit
Description/Function Contains safety and lockout equipment Contains safety and lockout equipment Contains safety and lockout equipment Contains safety and lockout equipment
Factory Pack Quantity 1 1 1 1
How to control the stepper motor to move in an arc with 51 single chip microcomputer
I want to use a 51 single-chip microcomputer to control two stepper motors to move in an arc, but I don't know how to calculate the arc, that is, how many steps the Y axis will take if the X-axis moto...
gyl52114 Embedded System
Can anyone provide some information on blood glucose meters?
Can anyone provide some information about blood glucose meters? Thanks...
analoglamb Medical Electronics
[RISC-V MCU CH32V103 Review] Real-time marking of file creation time
[i=s]This post was last edited by jennyzhaojie on 2021-3-19 00:23[/i]As mentioned last time, in the USB flash drive routine, the date of the newly created file is considered to be set, not the real ti...
jennyzhaojie Domestic Chip Exchange
Transfer, Electric vehicle charger drawings
Complete drawings of electric vehicle chargers, dozens of charger drawings...
yjtyjt Power technology
Did you have enough food in the morning?
Here is another picture of the bread I made last night. Because I used a small piece of old dough (which I had unscrewed and kept in the refrigerator when making bread a day or two ago) and very littl...
wangfuchong Talking
Countdown 60 seconds source code
#include #define uint unsigned int#define uchar unsigned charsbit P26=P2^6;sbit P27=P2^7;sbit s1=P3^0;sbit s2=P3^1;sbit s3=P3^6;sbit beep=P2^5;uchar temp,shi,ge,t;uchar code table[]={0xbf,0x86,0xdb,0x...
guoyuanqiang MCU

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

Robot
development
community

Index Files: 2268  1163  1180  345  2003  46  24  7  41  59 
Datasheet   0 1 2 3 4 5 6 7 8 9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
Room 1530, 15th Floor, Building B, No. 18 Zhongguancun Street, Haidian District, Beijing Telephone: (010) 82350740 Postal Code: 100190
Copyright © 2005-2026 EEWORLD.com.cn, Inc. All rights reserved 京ICP证060456号 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号