• You can log in to your eeworld account to continue watching:
  • LOCATION - 410.16(C)(1) THRU (C)(5)
  • Login
  • Duration:3 minutes and 4 seconds
  • Date:2022/09/28
  • Uploader:Lemontree
Introduction
keywords: electronic system
Switchboards are designed with busbars for fuses or circuit breakers that are used for protecting and supplying feeders and branch circuits. Panelboards are designed with a permanently installed main circuit breaker or single set of fuses for disconnecting the number of circuit breakers or fuseholders installed to protect and supply feeders or branch circuits.

SUPPORT AND ARRANGEMENT OF BUSBARS AND CONDUCTORS
408.3

Busbars shall be held firmly in place in the enclosure and shall be arranged in such a way to allow adequate space for conductors to be terminated. Busbars shall be sized with enough capacity to handle the normal currents in amps of the electrical system. In addition, they shall carry safely any type of short-circuit or ground-fault condition.

CONDUCTORS AND BUSBARS ON A SWITCHBOARD OR PANELBOARD
408.3(A)

Conductors and busbars on a switchboard, panelboard, or control board shall be so located as to be free from physical damage. Service sections of such boards shall be separated from the other electrical components. These components shall be properly secured in an approved manner. 

Note, conductors entering a certain section shall terminate in such section, except where it is not practical for control, interconnecting conductors, or other conditions of use.

OVERHEATING AND INDUCTIVE HEATING
408.3(B)

The arrangement of busbars and conductors shall be such as to avoid overheating due to inductive effects. The inductive effect of each conductor is neutralized when grouping all conductors together. To accomplish the minimizing of heating effects, the ungrounded (phase) conductors, grounded (neutral) conductors, and equipment grounding conductors, where used, shall be in the same enclosure, raceway, cable, cord, etc. (See Figure 7-1)

Unfold ↓

You Might Like

Recommended Posts

Qt Learning Road Chapter 55 Database Operations
[p=22, null, left][color=#555555][font=Tahoma, Helvetica, SimSun, sans-serif][size=14px][color=#333333][backcolor=rgb(247, 247, 247)][font=Tahoma, Arial, Helvetica, sans-serif]Qt provides the QtSql mo
兰博 Embedded System
This RF article is interesting - interpreting the empirical rules of foreigners for microwave circuits
Interpreting the Foreigners' Rules of Experience for Microwave Circuits Disclaimer: The article to be interpreted comes from a foreign paper. Some of the individual interpretation points are quite int
btty038 RF/Wirelessly
In the LM5118 datasheet, Application and Implementation section, "Minimum load current (CCM operation) = 600mA", what does it mean?
[i=s]This post was last edited by yhyworld on 2019-11-20 16:38[/i]See Figure 1,LM5118 specification, 8.2.1 Design Requirements, minimum load current (CCM operation) = 600mA. Figure 2 is Figure 19 ment
yhyworld Power technology
STC12C5A60S2 timer cannot be used
I made a new board, STC12C5A60S2. I can download programs, change the I/O port level, and even test a square wave with delay. But I can't use timer 1 to do PWM output. 1. I can output PWM on the old b
byron1902 51mcu
Wind panel control system
What method can be used to prevent the wind blown out by the fan from dispersing? How to deal with the shaking of the wind plate? Can an expert share some ideas?
茹古涵今 Electronics Design Contest
Autonomous low-power Tesla coil "Experimental"
[i=s]This post was last edited by btty038 on 2018-11-30 13:37[/i] The above test effect diagram, with further + high voltage frequency,... [b][color=#5E7384]This content is originally created by EEWOR
btty038 RF/Wirelessly

Recommended Content

Circuit

可能感兴趣器件

EEWorld
subscription
account

EEWorld
service
account

Automotive
development
circle

About Us Customer Service Contact Information Datasheet Sitemap LatestNews


Room 1530, 15th Floor, Building B, No.18 Zhongguancun Street, Haidian District, Beijing, Postal Code: 100190 China Telephone: 008610 8235 0740

Copyright © 2005-2024 EEWORLD.com.cn, Inc. All rights reserved 京B2-20211791 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号